Saudi Arabia
Seeking a Career in Electrical Power System and Protection Field, In Order to Apply my Experience, Academic Knowledge Further Improves My Skills And Experience.
Red sea zone
Project record · Zagazig Substation (500/220/66 /11) KV- Main Contractor: XD-EGEMAC · Alexandria Phase 1 DCS- Main Contractor: GIZA SYSTEMS · HOUSH EISSA Substation (220 / 66 / 11) KV- Main Contractor: ENERGYA · Damietta west (500/ 220/22) KV Substation - Main Contractor: KHRAFI NATIONAL · Cairo west (500/ 220) KV Substation - Main Contractor: Hyundai. · East Assuit 66/22/11 KV Substation - Main Contractor: Sieyuan Electric Co. · Suhag (500/220/66 /11) KV Substation - Main Contractor: KHRAFI NATIONAL. · East Ismailia (500/ 220) KV Substation - Main Contractor: GE (General Electric). capability to implement Testing and Commissioning of substation components (CT, VT, CBs, etc.) Testing and Commissioning of different schemes (Switchgear, GIS and Protection Schemes)
installing AIS and GIS & Commissioing of power substation installation of extension GIS substation in south Tanta (220/66 KV) Step up . the internal connection of GIS (Double bus Single breaker) (6 BAY)OUTGOING,(3 BAY )INCOMER,(4 BAY) for measuring,(2 BAY) For bus section,(1 BAY) BUS Coupler. Circuit breaker for each phase (R,S,T) (2 Transformer) 175MVA,(220/66KV) step up transformer installing (3 AIS BAY) ,each one consist of ( 1 circuit breaker , 1 CT for each Phase) installation of Colngiel GIS substation (66/11KV) step down. (3 BAY) INCOMER, (5 BAY) OUTGOING,(2 BAY) for measuring, (2 BAY) for bus section,(1 BAY) for bus coupler. Circuit breaker for all phases (3 Transformer) 40MVA (66/11KV) Step down transformer.