Basem Ahmed

Testing and Commissioning Engineer

Saudi Arabia

About

Seeking a Career in Electrical Power System and Protection Field, In Order to Apply my Experience, Academic Knowledge Further Improves My Skills And Experience.

Experience

  • Testing and Commissioning at alfanar
    Feb 2023 - Present · 3 yrs 5 mos

    Red sea zone

  • Commissioning Engineer at APC
    Oct 2019 - Feb 2023 · 3 yrs 5 mos

    Project record · Zagazig Substation (500/220/66 /11) KV- Main Contractor: XD-EGEMAC · Alexandria Phase 1 DCS- Main Contractor: GIZA SYSTEMS · HOUSH EISSA Substation (220 / 66 / 11) KV- Main Contractor: ENERGYA · Damietta west (500/ 220/22) KV Substation - Main Contractor: KHRAFI NATIONAL · Cairo west (500/ 220) KV Substation - Main Contractor: Hyundai. · East Assuit 66/22/11 KV Substation - Main Contractor: Sieyuan Electric Co. · Suhag (500/220/66 /11) KV Substation - Main Contractor: KHRAFI NATIONAL. · East Ismailia (500/ 220) KV Substation - Main Contractor: GE (General Electric). capability to implement Testing and Commissioning of substation components (CT, VT, CBs, etc.) Testing and Commissioning of different schemes (Switchgear, GIS and Protection Schemes)

  • Commissioning Engineer at CCG
    Jan 2019 - Oct 2019 · 10 mos

    installing AIS and GIS & Commissioing of power substation installation of extension GIS substation in south Tanta (220/66 KV) Step up . the internal connection of GIS (Double bus Single breaker) (6 BAY)OUTGOING,(3 BAY )INCOMER,(4 BAY) for measuring,(2 BAY) For bus section,(1 BAY) BUS Coupler. Circuit breaker for each phase (R,S,T) (2 Transformer) 175MVA,(220/66KV) step up transformer installing (3 AIS BAY) ,each one consist of ( 1 circuit breaker , 1 CT for each Phase) installation of Colngiel GIS substation (66/11KV) step down. (3 BAY) INCOMER, (5 BAY) OUTGOING,(2 BAY) for measuring, (2 BAY) for bus section,(1 BAY) for bus coupler. Circuit breaker for all phases (3 Transformer) 40MVA (66/11KV) Step down transformer.