The Hague, South Holland, Netherlands
I love working offshore and am keen to learn. I consider myself a teamplayer with a mentality set to achieve goals. Overcoming challenges requires a lot of effort and dedication but gives me ultimate job satisfaction. My objective is to become a skilled proffesional on the preparation and operational side of heavy lifting vessels.
Client Rep. on third party vessel AHV Kirt Chouest for a subsea scope to clear the seabed from collapsed tendon sections in the Big Foot field in a water depth of approx. 5,200 ft. Contractor was C-Innovation and subcontractor Delmar.
As an Rigger Foreman I am accountable for the organisation of my team and supervision of the efficient and safe execution all activities under my responsibility handed to me by the Shift Foreman or Assistant Superintendent. Assigned work is related but not limited to rigging and lifting activities and (un)mooring of barges as part of project portfolio execution or repair and maintence periods.
As Field Engineer I am the technical advisor of the Superintendent and Assistant Superintendent. I act as liaison between project team (onshore and offshore) and vessel staff. I co-operate with the Assistant Superintendent and other deck Foremen to ensure a smooth job preparation and execution. This is teamwork and all departments of the heavy lifting vessel and the project team on board need to work together in order to achieve success. As a Field Engineer I am a key figure in this process.
For a period of two years I was seconded to Noble Drilling which gave me the opportunity to get practical experience via a 2 years hands on training. During this period I have occupied various positions starting from Roustabout (deck crew) up to Assistant Driller and Safety & Training Supervisor. This experience has given me great benefits in my offshore career.
I've been working on a feasibility study for an Energy-Island in the North Sea. My thesis was rewarded with a 9.
During my time at the Projectbureau Regionale Waterkeringen, I investigated secondary water barriers for the water board of Rijnland. The main purpose of the Projectbureau is to see if the water barriers in the Rijnland district meet with the requirements of the waterboard. Therefore I performed calculations on dike stability. In another fase recommendations and designs for improvement were given to the water board.
During my traineeship I have been working for the Floating Department.