Türkiye
Qua. Dir., Claims&Diagnostic specialist: • Management of after sales notifications from domestic and foreign customers, • Diagnostic management of reported problems, • Warranty cost management (charge back), • Part constraint management of all car services.
Qua. Dir., Internal-External Trim Assembly quality process inspection specialist: • Performing planned and unplanned process audits, • Restriction the vehicles going to the customer, • To give final approval for deviation parts to be used in production, • Leadership of the project that will ensure that the right parts are fitted to the right vehicle, • Follow of quality tests and department budget (100k €/y).
In the Supply Chain Directorate, as the Logistic Leader; • Management of a shift team (60 blue collar) • Responsibility and performance tracking of 45 machines • Follow and responsible quality KPI • Financial follow and report of rental equipment (500k €/y) • Chairman of the Award Committee • Leading the R&D project (Active Noise Canceling).
My duties as a direct reporting to a French chief within the bodywork process eng. at Renault Bursa factory: • Preparation of specifications for specific in. transport equip. • Management of the approval process of the carriers • Purchasing department and shopping list • Technical evaluation of manufacturer's offers, etc
As a part-time engineer in R&D, Design Dep, Body Design team; • Reporting and benchmarking of aluminum alloys, • Design (Siemens NX) and research support for patent and article publications (with Chunky Method.) • Poke-Yoke designs for production
As a part-time engineer in Body Produc. Depart.; • Establishment of a system to measure the Gap&Flush status of vehicles on the production line • Solution of geometric differences of sliding doors of Doblo model • Apparatus design
At Chassis Rivet and Infrastructure Mounting Unit. Projects I'm involved in: New and ergonomic mounting table design for battery electric distributor installation for newly-started truck model (Actros), 24% paper savings by optimizing the Checklist book used for each truck produced, Spaghetti diagram in assembly line and time study analysis