Badreddine MAHRIA

Senior Project Manager

Greater Lille Metropolitan Area

About

Experience

  • ALTEN (Hybrid)
    • Senior Project Manager
      May 2023 - Present · 3 yrs 2 mos

    • Senior Project Manager
      Jul 2021 - Jun 2023 · 2 yrs

    • Project Manager
      Oct 2018 - Jul 2021 · 2 yrs 10 mos

  • Project Leader Manufacturing-Engineering: at Fujikura Ltd.
    Jun 2018 - Oct 2018 · 5 mos

    Validate the concepts defined during the acquisition of the new project, ensure the preparation of the MSD (Manufacturing System Design) study Coordinate with the multidisciplinary work team, define and lead the work plans of the project in development Ensure a good connection between product changes and their impacts on the manufacturing process, while maintaining optimal productivity performance Participate in the drafting of procedures and protocols relating to the engineering department

  • Pre-planning & Manufacturing Project Leader- Engineering at Aptiv
    Jun 2016 - Jun 2018 · 2 yrs 1 mo

    Realization of industrial hypotheses for the MSD (Manufacturing System Design) study Define industrial resources and project investment Define the space, flow and method of production Define the number and tasks of operators, time operations and balance positions Plan and ensure installation and start-up of the chain Coordinate between the different departments to ensure the good progress of the project Support the client during the development and serial life of the project Ensure the control, continuous improvement and optimization of the cost of production Participation in closing meetings of the project phases with the organization, publish the progress results and plans for the following phases Project resource management (4 technicians), assign responsibilities

  • Arkiglass (1 yr 2 mos)
    • Industrial Engineer
      Jul 2015 - May 2016 · 11 mos

      Ensure production scheduling in order to optimize costs Deployment of the maintenance management approach (CMMS) Consultation of supplier’s, technical validation (request for quotes, follow-up of purchase orders) Manage and lead QC story / QRQC meetings and pilot action plans Management of plant resources (90 employees)

    • Final year project
      Apr 2015 - Jun 2015 · 3 mos

      Configuration and implementation of a CMMS application for managing the maintenance of production machines. Audit and diagnosis of the maintenance function using the ADEPA-CETIM method. Reorganization of the warehouse using the 5S method, and determination of the safety stock for critical equipment. Establishment of preventive and corrective maintenance plans for production machines. Proposal of the GMAO-OPTIMAINT software package and development of functional tree structures. Configuration and integration of the Equipment, Stock, and Work modules into the GMAO-OPTIMAINT application.

  • Engineer Intern at Renault-Nissan Alliance
    Aug 2014 - Sep 2014 · 2 mos

    Implementation of the 5S OHSAS 18001 occupational health and safety training. Participation in QRQC meetings at the Soubassement workshop. Definition of major and minor objectives expected for a 5S project. Establishment of an action plan based on a critical study and audit of the existing situation. Execution of the action plan and implementation of reference states. Selection of daily/weekly/monthly monitoring indicators. Implementation of the “5S” monitoring dashboard.