Awais Hanif Qurashi

AI Software Developer (Full-Stack) | React, Node.js, TypeScript | Data-Driven Applications | Industrial & Supply Chain Systems (CPIM1 & Green Belt Certified)

Celle, Lower Saxony, Germany

About

Diverse set of experiences with a demonstrated history of working in the vast industrial environment with varied skills in both technical and managerial perspectives shaped me professionally. Full-stack software developer with industrial systems and supply chain domain expertise. Experienced in JavaScript, Node.js, React, SQL, Power BI, and SAP environments. Strong background in data-driven automation, backend development, logistics optimization, and process engineering. Delivered measurable impact including $12M shipment visibility, 18% logistics improvement, $365M spend analysis, and $2M cost optimization initiatives.

Experience

  • Baker Hughes (Full-time · 3 yrs 5 mos)
    • ASPIRE Leadership Associate - Supply Chain
      Jul 2022 - Nov 2025 · 3 yrs 5 mos

    • Extended Cross-Functional Projects
      Oct 2024 - Oct 2025 · 1 yr 1 mo

      • Advanced Netting Opportunities initiative to optimize resource utilization and reduce operational costs, mapped material flows, identified surplus inventory across sites, and proposed reallocation plans, resulting in up to $2M in potential savings. • Led Global Manufacturing e-Procedures Gaps Analysis across multiple facilities, conducted technician interviews, reviewed build plans, verified e-procedure availability, and implemented corrective actions, improving compliance. • Conducted quality assessments of e-Procedures across diverse manufacturing sites; identified systemic inconsistencies and coordinated with development teams to implement standardized templates. • Partnered with development team to ensure all updated e-Procedures met regulatory standards. • Security matrix data cleanup followed by IT triggers with the individual involvement of functional group owners. • Normalization of EBM triggers list initiated on different maintenance levels for different product lines contributing in global utilization of EBM.

    • Global AMO Repair Logistics Optimization
      Aug 2023 - Sep 2024 · 1 yr 2 mos

      • Validated and integrated multiple datasets, selecting the most accurate source for building a global repair logistics monitoring system. • Designed and deployed a Power BI dashboard covering global AMO repair shipments (approx. 12K+ annual shipments), providing real-time and historical visibility. • Automated data retrieval and shipment-days estimation, reducing manual update effort and ensuring timely reporting. • Established service-level thresholds (e.g., 15-day pending limit) that enabled proactive escalation of more than 50 critical delays in the first 3 months. • Analyzed historic logistics data across global regions to identify top locations with persistent backlogs; implemented targeted actions that reduced pending shipment days in these regions by 12% on average. • Implemented quick wins such as expediting Angola-to-Romania shipments after targeted discussions with key stakeholders. • Enabled continuous tracking of more than $5.8M in high-value in-transit items and approx. $6M pending at origin, achieving an 18% reduction in stagnant shipments within 6 months. • Created KPI-driven logistics performance reviews, helping regional leads prioritize actions that freed nearly $1.2M in working capital tied up in delayed shipments.

  • Diehl Controls (Wangen im Allgäu, Baden-Württemberg, Germany)
    • Master Thesis - Sustainability in product level from the phase of development
      Dec 2021 - May 2022 · 6 mos

      • Life Cycle Assessment of industrial heat pump inverter on EIME Tool based on Materiality Assessment outcomes and other analyses • Identified and suggested measures for improvement in terms of environmental protection and sustainability • Proposed Key Performance Indicators according to LCA practices according to ISO 14040 • Determined evaluation model specific for sustainable product development • Estimated environmental footprint and presented EPD following the future recommendations

    • Intern Corporate Innovation
      Sep 2021 - Nov 2021 · 3 mos

      • Proximity gap investigation for Arduino based 3-sense technology on proximity sensor • Program modification on Arduino IDE according to the needed outcomes • Extraction of numeric data and transformation into the graphical form by using Jupyter Notebook • Measured the outcomes of a proximity sensor by changing in 3-sense overlay design • Pitched for Persona and Knowledge café in departmental level

  • Working Student at Hans Seifert Metallgießerei GmbH
    Jan 2020 - Jan 2021 · 1 yr 1 mo

    • Precision machining among micro tolerances, evaluate blueprints, and processes • Casting-mold machining process, mold setup, calibration, and gauging • Inspection and perform QC for semi-finished as well as finished parts • Mold design as per the drafted blueprints including precision measurement and tolerances

  • Estimation & Procurement Officer at Ezzy Technologies
    Sep 2018 - Sep 2019 · 1 yr 1 mo

    • Planning and estimation of construction projects • Work on blueprints for estimation purposes mainly focusing on flooring trade • Quotation process including price comparative statements • Material decisions and selection that further lead to purchasing process

  • Operational Excellence Officer at Daraz
    Oct 2017 - Aug 2018 · 11 mos

    • Reporting on multiple ERP Systems, training material, and training sessions • Pivoted dashboard reports for daily orders and orders backlog • Transportation modelling of nearby drop-offs for vendors and maintain 5-S • Vendor training sessions including the coaching on maintaining SLAs