Diyarbakır, Türkiye
I am an Electrical and Electronics Engineer with over 15 years of experience in power generation, transmission, distribution, and infrastructure/superstructure projects. Throughout my career—from site chief to project manager—I have played an active role in large-scale solar (PV), hydroelectric (HEPP), and substation projects both in Turkey and abroad (Iraq). While pursuing my master’s degree in renewable energy, I am combining my technical expertise with strategic management skills, aiming to become a senior executive in international energy projects. I possess strong competencies in teamwork, project coordination, and regulatory permit processes, and I continue to progress with a visionary approach from engineering toward executive leadership.
Tokat Killik bölgesinde mevcutta var olan 100 MW’lık Rüzgar sahasına 26 MW’lık GES sahası ve 35 MWH/70 MWH depolama ünitesi kurulacaktır. Proje devam etmektedir.
∙ Within the scope of Viranşehir Yeka GES-4, I have been carrying out the works since the permit processes of the work with the official institutions within the scope of the establishment of the 150 MWe (Tracker) capacity GES field and the establishment of the 6-feeder 154 kV TM and 36 km long 99-pole 154 kV transmission line. Our project is still ongoing.
BAZIAN SIMPLE CYCLE POWER PLANT PROJECT ( 505 MW ) Fast-Tracking EPC Project Tracking And Controlling for ; • To conduct inspection of all ongoing activities for electrical&instrument installations. • Inspection installation of Switchyard Electrical Equipment & Testing such as (Load Test e.c.) • Reporting the noncompliances to client in terms of technical issues. • QA/QC documentation and review Contractor construction electrical procedures. • Supervise and inspect installation of cable, cable tray ,ductbank&cable trench •Lighting, distribution&control panel, all electrical equipment and grounding system, etc with respect to standarts and typical details.. • Witness and verify grounding system tests and lightning protection system tests. • Responsible from equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning. • Project Follow and Inspection of Application Site • Prepare dayly surveillance reports, non conformance reports and verification of
Şanlıurfa 3rd and 4th Group Siverek District Underground LV/MV facility construction work continues. Şanlıurfa 2.Group Siverek District Siverek 4 Underground LV/MV facility construction and provisional acceptances were made and the work was delivered.(2020)
Within the scope of Sarıkamış Karakurt HEPP work, we are constructing a 154 kV transformer center consisting of 3 transformer feeders, 3 line feeders and transfer feeders, and the transformer center is about to be finished. In addition, within the scope of the work, all electrical assembly works, automation works and commissioning of 1 hydroelectric power plant with a total installed power of 100 MV, consisting of 3 generators, were successfully carried out.