Aung Khin (RIT-Alumni-Sg)-Chemical

Senior Process Engineer at M+W Singapore

Toronto, Ontario, Canada

About

Professional: • Accomplished Process Engineer with more than 16 years experience particularly in Ultra Pure Water (UPW) Treatment Plants for Semiconductor Manufacturing • Experience in UPW plants detailed design co-ordination, reviewed P & ID, Process interlock & control, selection of system integrator & awarding tendor, design of plant layout, supervised installation & commissioning UPW plants with various system integrators • Skillful in neutralization waste water treatment & slurry treattment plant installations & commissioning • Knowledgeable in pump sizing, gravity drain design & material selection, ultra pure water loop design and pipe sizing • In depth knowledge of waste water analysis procedures to comply with Singapore effluent discharge limit standards • Expert in UPW plant operation within stringent point of use UPW water quality criteria • Operated UPW plant quality assurance in compliance with SPC, FMEA, OHSAH & ISO standards • Trained in volatile flammable solvent extraction plant (Rice Bran Oil Mill) operations & maintenance • Managed and achieved Rice Bran Oil production targets Personal: • Experience in handling numerous projects effectively and efficiently within high pressure & demanding environments • Quick learner with strong motivation to acquire skills in new technologies and develop other skills to effectively contribute to improve quality of industry standards • Good team motivator with organizational awareness, leadership skills, persuasive communicator, effective planning & organizing skills with excellent interpersonal relationship skills Specialties: • Chemical Technologies, Process Flow Diagrams, Safety interlock, Heat and Material balances • Equipment sizing,Hydraulic calculations • Skillful analytical knowledge based on all technical aspects • Continuous professional development of job-related technologies

Experience

  • Senior Process Engineer at Exyte
    Aug 2018 - Apr 2024 · 5 yrs 9 mos

    • To supervise design and installation 2 x 525m3/hr Ultrapure Water plant in Micron Semiconductor Asia Pte Ltd with Suez’s Water Technologies and Solutions | Singapore. • Review design process equipment, P&ID, control logic, process technology, mass/energy balance • Installation inspection as per P&ID, piping pressure tests, loop check on instrumentation & control • Witness upon FAT, SAT, Scada testing, control philosophy and logic testing • Commissioning the plant within the specification • Do own technical calculations to verify the process equipment & requirements • Supervise to clear the punch lists with Suez employees and contractors

  • Senior Process Engineer at International Facility Engineering
    Feb 2018 - Jun 2018 · 5 mos

    • Metro cold room storage and processing food facility system in Thilawa, Yangon • To supervise and installation 20 m3/hr RO treatment water system, Waste water treatment system and RO permeate water cold and hot supply piping network design and installation • To inspect sanitary and shower piping installation with gravity waste water drain line with oil trap before discharge to sewage system • Review design process equipment, P&ID, control logic, new process technology, mass balance • Installation inspection as per P&ID, piping pressure tests • Supervise daily site meeting and inspect site progress to comply with safety procedure

  • Trading & Construction Coordinator at KA-BA-KYAW CONSTRUCTION (Myanmar)
    May 2012 - Feb 2018 · 5 yrs 10 mos

    • Stationed in Toronto, occasionally travel to Myanmar for Family Business. • Arranged meeting with construction material suppliers for delivery schedule and cost matters • When necessary, visiting the sites occasionally • Contacted with overseas/ local indoor decorative material suppliers • Monitored construction budget as per project basis • Review quantity & cost for material construction

  • Principal Engineer at Global Foundries Singapore Pte Ltd
    Apr 2006 - Apr 2012 · 6 yrs 1 mo

    • Supervised Fab 6-150 m3/hr new UPW plant |120 m3/hr Reclaimed plant | UPW loop design reviewed, installation and commissioning with Glegg water | Canada • Oversaw project to increase slurry treatment plant capacity from 15 m3/hr to 30 m3/hr • Led project to add various types of chemical and water drain lines to support Fab ramp plan • Conducted feasibility study of Newater used as feed water to UPW plant with Public Utility Board • Supervised to lay 300mm & 500mm cement lined piping 2 kilometres route for 4 Fabs • Facilitated PLC control logic modification for backup Newater by Domestic water • Commissioned UPW plants with Newater without affecting the UPW water quality with respective plant engineers successfully.

  • GLOBALFOUNDRIES ()
    • Senior Engineer
      Apr 2000 - Mar 2006 · 6 yrs

      • Supervised $25 million (USD) project ( Fab 6-150m3/hr new UPW plant / 120 m3/hr Reclaimation plant / UPW loop) design review, installation & commissioning with Glegg water, Canada • Oversaw $200 K (USD) project to increase slurry treatment plant capacity (15m3/hr to 30m3/hr) • In charge $400 K (USD) project to add various types of chemical & water drain lines to support Fab ramp plan • Feasibility study of Newater used as feed water to UPW plant with Public Utility Board • Supervised to lay 300mm & 500mm cement lined piping 2 Km route for 4 Fabs • Facilitated PLC control logic modifications for backup Newater by domestic water • Commissioned UPW plants with Newater without affecting the UPW water quality with respective plant engineers Achievement; • All the projects completed on schedule, under budget and put in operation • Sucessfully commissioning the plants (Fab2/3/5/6/7) with alternative Newater supply without any quality issues

    • Chemical Engineer
      Sep 1995 - Mar 2000 · 4 yrs 7 mos

      •Supervised $50 million (USD) projects (Fab 2-300 m3/hr new UPW plant / 60 m3/hr reclamation plant / UPW loop) design review, installation & commissioning with H & E | Germany • Led $1 million (USD) project to add 300m3/hr new Waste Water Teatment plant with US Filter | USA • Oversaw $500 k (USD) project adding 20m3/hr new Slurry Treatment Plant with US Filter | USA • Managed $400 K (USD) project to add various types of chemical & water drain lines to support Fab ramp plan including tools relocation • Presided $20 million (USD) project (Fab 3-75 m3/hr new UPW plant / UPW loop) design review, installation & commissioning with Kurita | Japan • Oversaw $1 million (USD) project to add 20m3/hr new Slurry Treatment Plant with KCH | Germany • Support Fab2 operation & maintenance Achievement; • Resolved all the technical concerns / strigent water quality issues effectively • All the projects successfully completed on the schedule, under budget, without any safety incidents to support manufacturing • Improved management skills, planned proactively to meet project schedule, new technology knowledge acquisition • Gained UPW technologies/processing skills from Germany, Canada, Japan, South Africa & Singapore