Atakan Burhan Şahin

Technical Trainer

Istanbul, Türkiye

About

Experience

  • ENKA Pazarlama İhracat İthalat A.Ş. (2 yrs 7 mos)
    • Technical Trainer
      May 2025 - Present · 1 yr 3 mos

    • Construction Machinery Engineer
      Jan 2024 - Present · 2 yrs 7 mos

    • Project Engineering
      Jan 2024 - Present · 2 yrs 7 mos

  • Combined Cycle Maintenance and Commissioning Engineer at Aksa Enerji Üretim A.Ş.
    May 2023 - Feb 2024 · 10 mos

    work as a combined systems maintenance engineer at the power plant with an installed capacity of 153 MW. Operation of 8 Aalborg Waste Heat Boilers and 1 Dreser Rand Steam Turbine I am responsible for the maintenance of Condenser Pumps Treatment systems Cooling Tower pipelines and auxiliary equipment I am the manager of a team of 15 people Daily, weekly, monthly production monitoring and reporting, Coordination and planning of daily, weekly, monthly and annual maintenance, To determine the risk and to prepare risk programs to take safety measures. To be responsible for the maintena

  • NDT Inspector at ENKA Power Plants - Gebze (1631 MW), Adapazari (818 MW), Izmir (1520MW)
    Feb 2023 - May 2023 · 4 mos

    Full description of all Tests to be Performed and work plan scheduled and performed during the downtime Providing the techniques to be applied, the procedure to be followed, the scope of work to the personnel who will conduct the examination, within the rules. Status, progress, monitoring of inspection plans and transferring them to customers and specific people with regular reports Arrangement of acceptance criteria for process results by plant specialists or metallurgists Checking and reporting HP drum Lp Drum Boiler drums Steam turbine valves pipelines to the required standards

  • Project Engineering at Makyol İnşaat Sanayi Turizm ve Ticaret A.Ş.
    May 2018 - Feb 2023 · 4 yrs 10 mos

    The investment, which was tendered in 2017 under the name of “Guzelyurt and Meserya Plain Irrigation Transmission Structures”, has reached the completion stage. When the investment is completed, it is planned to irrigate 18 thousand 730 decares of land in Güzelyurt and 97 thousand 200 decares in Meserya Plain with the Transmission Tunnel with a length of 5 thousand 700 meters. “Turkish Republic of Northern Cyprus (TRNC) Irrigation Transmission Tunnel Engineering, procurement, construction, commissioning, operation and performance tests of these projects Northern Cyprus Irrigation Transmission Tunnel Water Supply Project 1500 Nominal Diameter Penstock Pipeline Project Construction Machinery maintenance, repair and supply Mechanical room setup Pump House Electrical Infrastructure Engineering works Mechanical works Pump and Flow meter Installation Tunnel Drilling Machine Segment Concrete Curing System Installation Preparation of progress and quality file Non-Destructive Testing (Magnetic, Ultrasonic and Radiography) Purchasing and administrative affairs Site D mobilization

  • Asistan Art Director at TMC FİLM MÜZİK ÜRETİM ve PAZ. A.Ş.
    May 2017 - Jul 2017 · 3 mos

    Director Yavuz Turgul Road Separation Movie