Addis Ababa, Ethiopia
Dynamic Test and Commissioning Engineer with over Nine years of experience in the electrical engineering sector, demonstrating a strong commitment to delivering high-quality solutions. Currently engaged at Electrical Engineering Systems PLC.(Hitachi Switzerland )agent specializing in the rigorous testing and commissioning of electrical systems and power telecommunication systems through out the country The National Grid network systems . A solid educational foundation in electrical engineering, complemented by hands-on expertise in system evaluations. Dedicated to advancing professional development and contributing to innovative engineering projects. participating different mega projects based on the the power network telecommunication in Ethiopian Electric power high transmission rehabilitation project more than 66 high voltage substations, Ethio-Djibouti railway traction substation engaging power communication with existing EEP Power communication network from Sebata traction substation to dwanlae Traction substation, Ethio- Kenya HVDC 500KV Projects in Ethiopia side from Wolayita 500KV Converter station up to Mega repeater stations, Assela100MW Wind farm project performed with the existing EEP NETWORK Via assela <>koka230kv,assela <>bekoji23230kv power communication network configuring to communicate with National Load Dispatch Center(NLDC).
2025-2023 ,Assela 100mw wind farm, koy abo substation , woda steel factory perform the telecom installation upgrading troubleshooting ,test and commissioning . Midroc maya pp bag factory main board maintenance project. .2022-2021Ethio -kenya HVDC project including wolayita sodo 400kv,ground station ,konso repeater station and mega repeater station (installation testing and commissioning . .2020-2018 Ethio-Djibovuti railway project 17 New traction substation from sebeta to Dawnle traction substation and EEP six existing substation completion task site survey,,material dispatch,Erection,installation, configuration and test Commissioning. Telecommunication test and commissioning project EEp New and existing station Hawassa substation,yigalem existing substation ,New yirgalem 400kv substaion. Kebridhar ,Gode substation. .2017-2016 Ethiopia Electric power project More than 66 power substation rehabilitation upgrading Telephony and telecommunications Network systems. .wonji shewa sugar factory automation installation project.