Arslan Babar

ARE Electrical SKMCH & RC II Ex Manager E/M Pakistan Airport Authority || Ex MEP Engineer Zameen Development (High Rise Buildings) II PARCO Projects (Oil & Gas sector) & 132kV Grid Station II Hospital Projects.

Lahore District, Punjab, Pakistan

About

As a results-oriented Electrical Engineer with extensive expertise in electrical and MEP design, construction, and commissioning, I have a proven track record of successfully managing large-scale projects across diverse sectors, including Oil & Gas, Airports, Hospital (Cancer), Commercial Solar Systems, and High-Rise Buildings. My experience includes seamless coordination with stakeholders, adaptability to complex challenges, and a commitment to collaborative teamwork in dynamic environments.

Experience

  • Assistant Resident Engineer (Electrical) at Shaukat Khanum Memorial Cancer Hospital and Research Centre
    Oct 2025 - Present · 10 mos

    Assistant Resident Engineer (Electrical) Coordination, Supervision and Execution of following services at Shaukat Khanum Memorial Cancer Hospital & Research Centre, Karachi Electrical Works: - Earthing / Grounding System - Lightning Protection System - Structured Cabling Network - Intelligent Addressable Fire Alarm System - IT, Telephone, Data & TV System - Closed Circuit Television System (CCTV) - External Security System for Entry and Exit Lanes - Public Address System (Zone Distribution) - Access Control System - Nurse Call System - UPS System - Q Ticketing System - Transformers (2000 kVA Dry Type) - BTD (6300A to 630A) Al. - Kiosk Type Substation - DG sets (2000 kVA) with Diesel Fuel Supply System - BMS (Complete Integration with HVAC and Power Systems) - HT Panels (11kV) - Syn Panels (Transformers and DG set parallel Logic) - LT Feeder Panels/MCCs - LT SMDBs/DBS - LT& HT Cables - Light Poles - Direct Current Supply System - Solar Power System (SPS) - Data Centre (Precision Cooling System) - Lifts - FM200 Fire Suppression System - Sewage Treatment Plant - Medical Equipment Installation - RO Plant Electrical Work - Medical Gases Work in all respect.

  • Manager (Electrical/Mechanical) at Pakistan Airports Authority
    Dec 2024 - Oct 2025 · 11 mos

    Manager (Electrical and Mechanical - E/M) Coordination, Supervision and Execution of following services at Allama Iqbal International Airport (AIIAP) Expansion Project, Lahore Electrical Works: - Earthing / Grounding System - Lightning Protection System - Apron Lighting System - Cathodic Protection System - Structured Cabling Network - Intelligent Addressable Fire Alarm System - Closed Circuit Television System (CCTV) - External Security System for Entry and Exit Lanes - Public Address System - Master Clock System - Flight Information Display System (Fids) - Access Control System - Passenger & Baggage Screening System - Advanced Visual Docking Guidance System (AVDGS) - 400 Hz Aircraft Ground Power Units 125a-50Hz Socket - Transformer (1250 and 1500 kVA) - RMU (Ring Main Unit) - Kiosk Type Substation - LT Switchboard / LT Outdoor Distribution Board - LT Distribution Boards - Motor Control Centers - Direct Current Supply System - Solar Power System (SPS) - Data Centre Mechanical Works: - Hydrant Refueling System (HRS) - Natural Gas Piping - Fuel Storage & Supply System to DG Sets - Hydraulic Road Blocker & Tyre Killers - Lifts - Escalators - Baggage Handling System - Passenger Boarding Bridges - FM200 Fire Suppression System - Precision Cooling System - Pre-condition Air system - Sewage Treatment Plant

  • Zameen Developments (Lahore, Punjab, Pakistan · On-site)
    • MEP Lead Engineer
      Sep 2024 - Jan 2025 · 5 mos

      MEP Lead Engineer: Project: Zameen Quadrangle ( High Rise Building Project - B2+11) Incharge of Construction of MEP works in all respect. 1- Design review and Shop Drawings 2- Execution and Coordination 3- Procurement and Take-offs 4- IPCs and Vendor Management - Electrification Work - BTD Work - CCTV System - Fire Alarm System - Data & Telephone System - TV System - Public Address System - Access Control System - Fire Fighting System - Water Supply System - Plumbing System - Earthing and Lightning Protection - LV & HV panels - 1250 kVA Transformers - 750, 500 & 300 kVA Genset - UPS System - Control System - Lifts (Passenger and Cargo) - Ventilation Ducting (HVAC) - Garbage Chute

    • MEP Engineer
      Aug 2023 - Nov 2024 · 1 yr 4 mos

      MEP Project Engineer: Project: Zameen AURUM ( High Rise Building Project - B3+11) Incharge of Construction of MEP works in all respect. 1- Design review and Shop Drawings 2- Execution and Coordination 3- Procurement and Take-offs 4- IPCs and Vendor Management - Electrification Work - CCTV System - Fire Alarm System - Data & Telephone System - TV System - Public Address System - Access Control System - Fire Fighting System - Water Supply System - Plumbing System - Earthing and Lightning Protection - LV & HV panels - 750 kVA Transformers - 500 & 300 kVA Genset - UPS System - Control System - Lifts - Ducting (HVAC) - Swimming Pool Work

  • MEP Project Lead at MMA CONSTRUCTION
    Mar 2023 - Aug 2023 · 6 mos

    MEP Project Manager: Project: Capital Icon Mall & Residency ( High Rise Building Project) Incharge of Construction of MEP works in all respect. 1- Design review and Shop Drawings 2- Execution and Coordination 3- Procurement and Take-offs 4- IPCs and Vendor Management - Electrification Work - CCTV System - Fire Alarm System - Data & Telephone System - TV System - EV Chargers - Public Address System - Access Control System - Building Management System (BMS) - Fire Fighting System - Water Supply System - Jet Fans System - VRF System - Plumbing System - Earthing and Lightning Protection - LV & HV panels - 2500 kVA Transformers - 2500 kVA Genset - UPS System - Control System - Lifts

  • MEP Project Engineer at ASM Builders & Developers
    Dec 2022 - Apr 2023 · 5 mos

    In charge of Electrical Department with additional charge of Mechanical Department: Project: Pak-Turk Maarif School and Colleges 1- Supervision and Coordination following: * Electrical works with all respect. - Procurement, QA/QC , IPC and Execution. * Control System with all respect. - Procurement, QA/QC , IPC and Execution. *Mechanical System with all respect - Procurement, QA/QC , IPC and Execution. - Electrification Work - CCTV System Installation. - Fire Alarm System Installation. - Public Address System Installation. - 30kVA UPS Installation - Wifi System Installation. - Data and Telephone System Installation. - Passenger and Cargo Lifts Installation. - Earthing and Lightning Protection system Installation. - 400 kVA Genset Installation. - 400 kVA Transformer Coordination. - LT Panel Installation - ATS Panel Installation. - Cable Tray Work - VRF System Installation - Fire Fighting System Installation - Gas System Installation - Water Supply System Installation - Plumbing Works - Light Poles Installation - External & Internal Duct Work - RCC Pipe Work Coordination