ANIL GÜNGÖR

Akronex International Fire Engineering Inc Co, Managing Director / Factory Manager

Greater Istanbul

About

Experienced on manufacturing and Quality Control System Management Steel Structure Design, Pressure Vessel ( API, EN 13445, ADR 2000, ASME ) Boiler, Piping Systems. Factory Management under the reqirements of 5S and SHE Regulations Implementation of the CRP/ ERP System for increased Productivity

Experience

  • Steel deck fabrication Specialist- Chacao Bridge Project (Senior Bridge Construction Engineer) at COWI
    Aug 2025 - Present · 1 yr

    The Chacao Bridge will have a total length of 2,634 metres with side spans of 284 metres at the north side, 140 metres at the south approach bridge and with 2 main spans of 1,155 metres on the north and 1,055 metres on the south side. It is suspended by three concrete pylons with heights of approximately 157 metres, 175 metres and 199 metres above Mean Sea Level. / El Puente Chacao tendrá una longitud total de 2.634 metros con vanos laterales de 284 metros en el lado norte, 140 metros en el viaducto de acceso sur y con 2 vanos principales de 1.155 metros en el lado norte y 1.055 metros en el lado sur. Está suspendido por tres Pilas de hormigón con alturas de aproximadamente 157 metros, 175 metros y 199 metros sobre el nivel medio del mar.

  • Co-Founder at AKRONEX UK LTD
    Mar 2021 - Present · 5 yrs 5 mos

  • Managing Director / Factory Manager at Akronex International Yangın Mühendislik A.Ş.
    Mar 2019 - Present · 7 yrs 5 mos

  • Quality Control Manager at Norse Group Of Companies
    Jan 2018 - Feb 2019 · 1 yr 2 mos

  • QC Manager at norse çelik
    2018 - Feb 2019 · 1 yr 2 mos