Amir Shith , PEng, CEng, PMP

Subsea Technical Manager at Saipem

Abu Dhabi Emirate, United Arab Emirates

About

❹Career Objectives: • A self-motivated Package Manager, Operation Manager, Project Manager with over 16 years’ experience in Oil & Gas Sector specialize in Project Management for SURF, Subsea ,Offshore Wind Farm, Onshore Plant and Offshore Platform. • Seeking for a position as Technical Manager , Project Manager, Operation Manager or any engineering or executive position that is suitable with my working experience & my academic qualification where I can grow & become an asset. • To work with a company which will assign me to challenging projects and help me in advancing my career

Experience

  • Saipem (Full-time · 6 yrs 10 mos)
    • Subsea Technical Manager
      Jul 2024 - Present · 2 yrs

      Subsea Technical Manager for LTA No. 127 - MARJAN GAS LIFT FACILITIES PACKAGE 2 (USD 2 Billion Project Value) Fixed Facilities - Demolition of existing 8 wellhead platform topsides (n.2of 4L-6W + n.6of 6L-6W) - Installation of 8 new Wellhead platform Gas Lift Decks Modules overall weight approx. 7,000 (MT) - Demolition of 2 Jackets (no.2 4L-6W) - Installation of 2 new Slipover (SSS) Jackets (4L-6W) overall approx. 1,600 (MT) - Retaining of existing 6 jackets & boat landing - Installation of 1 new Tie-in platform TP-1 AUX = 6-legged jacket (1810 MT) and topside (3500 MT) Brownfield Works - 3 In-Situ Topside Upgrade to Gas Lift Capable - Tie-In Platforms Upgrade in 5 locations Modification to topside facilities, new and retrofit risers, J-tubes, riser, and J-tube supports) overall approx. 6,500 (MT) Subsea Facilities - Subsea Pipelines (oil & gas) : Total of approx. 170 km, 27 rigid flowlines (4”-10”/12”/16”/30” ) + 1 flexible (4”) - 2 replacement of oil flow lines of 16” with 12”, total approx. 6.5km - no.330 spools + no.250 crossings + extensive intervention works - Submarine 5kV and 15 kV composite cables (approx. 67 km in 13 sections) - Submarine FOC (approx. 3.5km in 1 section)

    • Subsea Technical Manager
      Jun 2023 - Present · 3 yrs 1 mo

      Subsea Technical Manager for LTA No. 124 - MARJAN GAS LIFT FACILITIES (USD 1 Billion Project Value) Managing all technical aspect of project and focal point for resolving any technical issue with Company. Providing technical sound solutions to Company for below scope of work: Base Scope with Alternative Mandatory Option: • (5 nos) SSS Gas lift PDMs* (Total 4,552 MT) – scope includes demolition of existing PDMs • (5 nos) SSS jackets* (Total 4,548 MT) – scope includes demolition of existing jackets • Upgrade of TP-7, TP-10 and TP-13 and GOSP-4 platforms • (20 nos) subsea flowlines (4” and 6” Gas Lift, Total 125 KM) • (5 nos) 5 kV/15 kV subsea cables (Total 17.3 KM) • FO Cable (Total 5.7 KM) • (16 nos) Wells Hook-Up • Tie-in of new riser and corridor spool to existing 12” and 16” oil service pipelines

    • Technical Manager
      Oct 2021 - Jul 2023 · 1 yr 10 mos

      Project Technical Manager for Al-Khafi Joint Operation Project – Laying of New Hout Transmission Line for 40 Kilometres and Associated Works. Managing all technical aspect of project and focal point for resolving any technical issue with Company. Providing technical sound solutions to Company for below scope of work: Offshore RGS Platform: - Scraper Launcher and associated piping - Tie in with Existing Facilities including Utilities - Valving and Piping - Riser - Deck extensions for the new Facilities - Related Instrumentation and Electrical works - Local structural strengthening & Grouting of annulus between jacket leg and pile. Offshore Crude Transmission Line: - 20’’ Crude Transmission Line, approx. 40km with flanged spool for connection to riser - Crossing of existing Facilities (Approx. 17 crossings) Onshore: - Scraper Receiver and associated piping - Short Onshore section from Landfall to Scraper receiver - Tie in with existing Facilities including Utilities - Valving and Piping - Related Instrumentation and Electrical works

  • TechnipFMC (2 yrs 10 mos)
    • Project Manager
      Jun 2018 - Oct 2019 · 1 yr 5 mos

      Project Manager for Shell Gumusut Ph2. SPS Tender Lead for Petronas Limbayong Tender. Project Manager for Petronas Chinguetti Plug & Abandonment

    • Product Project Manager (Structure Manifold Interconnecting Systems)
      Jan 2017 - May 2018 · 1 yr 5 mos

      Package Manager - Shell Gumusut Ph2 Manifold and Well Completion System.

  • FMC Technologies (5 yrs 2 mos)
    • Product Project Manager (Manifold & Pipeline Systems)
      Dec 2011 - Jan 2017 · 5 yrs 2 mos

      Construction planning and monitoring (schedule, cost and compliance of work to project specifications). Reporting the construction progress and costs trends to the Project Director. Certifying the construction work progress to support the authorization for payments Monitoring the construction progress and costs and coordinating actions required to keep project on budget and on time. Supervising/coordinating the construction activities ensuring that the highest HSEQ standards are maintained throughout the project. Responsible for the tender execution during bidding process. Responsible to lead the design review process with the Company’s package lead and engineer Responsible to ensure all free issue items to the fabricator arrive on site within agreed time frame. Support the Construction Manager in controlling/manage the Manifold Contractors. Supervise contractor’ construction sites, ensuring that contractor works are performed according to project specifications, budget and schedule. Coordinate FAT/EFAT and SIT for the manifold at the fabrication yard. Coordinate the delivery of the products in accordance to the installation schedule.

    • Operations Manager
      Jun 2015 - Jun 2016 · 1 yr 1 mo

      Seconded to FMC Technologies Australia from FMC Technologies Singapore to work on the Subsea Service department. Plan for day-to-day coordination and management of business operational activities. To ensure all the offshore equipment/tools and also service personnel are ready when client call for offshore mobilization. Communication with Client and Rig to ensure all their need and requirement of getting tools and personnel to be ready on time for offshore mobilization. To provide the daily status report on the equipment readiness to the client. Daily meeting with Workshop, Logistics, Quality and Safety Departments. Responsible to provide input into Operations Planning. To create Service Order for Workshop, Material Purchase & Third-Party Engagement. Create and managed RFQ log. Administer PONC (Product of Non Conformance) to Mobilize Equipment Offshore Handling all the logistic arrangement for the equipment that will loaded back to onshore after completed the offshore work. This arrangement including to rework the defect part. Manage and maintain Offshore Documentation (Signed ICP/PSM), Master Equipment List (MEL) & End of Well Reports. Forward Rig FNCRs to appropriate personnel for disposition. Coordinate the technical activities of engaged Vendor/ Third-Party Services personnel. Deliver Payment Certificates.

  • Subsea Engineer at Shell
    Jan 2011 - Nov 2011 · 11 mos

    Responsible for design and analysis of subsea systems from reservoir to the topsides processing unit. Addresses system functionality, components & optimization, to assure delivery on expectations for availability and operability. Develops project specifications and be involved in the tendering & evaluation of design, installation and procurement contracts. Verifies the design integrity of work carried out by Engineering contractors to ensure that the proposed solutions are technically sound and meet operability & maintainability requirements. Manages interfaces between system components and the various engineering disciplines involved. Participates in construction, pre-commissioning and commissioning activities. Supports maintenance and inspection staff and participate in teams to troubleshoot customer issues.

  • Project Coordinator at Cameron
    Oct 2009 - Jan 2011 · 1 yr 4 mos

    To oversee overall planning, coordinating manufacturing activities, project management and budgeting. Plan and coordinate project activities for timely completions. Coordinating the manufacturing progress of the subsea Christmas Tree and also wellhead as per agreed schedule. Supervising the manufacturing activities ensuring that the highest HSEQ standards are maintained throughout the project. Conduct internal meeting with technical, project team & client to resolve project issues efficiently. Reporting the manufacturing progress and costs trends to the Project Manager. Certifying the manufacturing work progress to support the authorization for payments To develop the operational business within the scope of the contract by offering the client support services. To ensure that the works carried out under the contract satisfy the client’s and the Company’s environmental and safety standards.