Aline Alondra Atziri Cruz Villada

Chemical Engineer | Project Management | Oil & Gas | Logistics & Supply Chain

Mexico City, Mexico

About

Chemical engineer with experience in energy sector. My work reflects focus, adaptability and responsibility.

Experience

  • Consultor SASISOPA - Riesgo de proceso at Novo Control, S.A. de C.V.
    Mar 2022 - Present · 4 yrs 4 mos

    Lideré y gestioné el desarrollo de Programas de Prevención de Accidentes del Sector de Hidrocarburos (PPA) y Protocolos de Respuesta a Emergencias (PRE) para diversos proyectos del sector hidrocarburos. Colaboré en proyectos de consultoría para el cumplimiento y seguimiento del SASISOPA (Industrial y comercial), desarrollo de Análisis de Riesgos del Sector Hidrocarburos (ARSH), elaboración de Estudios de Riesgo Ambiental (ERA) y desarrollo de Licencias Ambientales Únicas para diversos proyectos del sector hidrocarburos.

  • Transcriptor - Traductor at TransPerfect
    Sep 2021 - Dec 2024 · 3 yrs 4 mos

    Transcripción y traducción de audios en español e inglés para proyectos internacionales, asegurando la adaptación de contenido lingüístico y cultural para garantizar precisión y fluidez. Colaboración con equipos multiculturales en la gestión y revisión de materiales traducidos. Edición y corrección de transcripciones y traducciones para asegurar calidad y coherencia. Uso de herramientas de transcripción y software de traducción asistida para optimizar procesos. Manejo de distintos acentos y terminologías específicas según el contexto del proyecto. Cumplimiento de plazos estrictos y gestión organizada de archivos de audio y documentos.

  • Sempra Infraestructura (On-site)
    • Material Coordinator
      Jan 2019 - Jun 2021 · 2 yrs 6 mos

      Planned and coordinated the reception, accurate, and timely dispatch of spare parts. Organized warehouse resources by applying efficiency criteria and optimizing available space. Conducted physical and financial inventories, including demand forecasting and indicator tracking. Led the development and implementation of CAPEX projects. Managed the SAP MM/WM Implementation Module project, overseeing its deployment across all company assets. Defined the supply, installation, and configuration processes for the spare parts and hazardous materials warehouse of an oil storage terminal during the pre-commissioning, commissioning, and start-up phases. Developed an ABC classification system and standardized spare parts descriptions to optimize inventory. Led the initial inventory setup and data migration into SAP.

    • Operator training program
      Jan 2019 - Apr 2019 · 4 mos

      Training Courses: Basic Science Training Program for Operators, Finance for Non-Financials, Basic Corrosion Course, Oil Product Storage Facility Maintenance, Maintenance Organization and Management, Fundamentals of Process Safety, Tank Car Operations and Emergency Response, Cathodic Protection and Coatings, Introduction to SASISOPA, Fundamentals of Electricity for Installation Engineers.

  • Analista de laboratorio at ALLIANCER
    Aug 2018 - Jan 2019 · 6 mos

    Implementación de la norma NMX-EC-17025-IMNC-2006. Análisis de factibilidad para la integración de nuevos métodos de ensayo. Realización de pruebas de control de calidad y desempeño en pinturas para señalización vial, pinturas arquitectónicas y recubrimientos. Ejecución de ensayos de niebla salina y envejecimiento acelerado para evaluar la durabilidad de materiales. Verificación y calibración de equipos de medición para garantizar precisión en los resultados.

  • Inspector de control de calidad at Publigrafic International
    Apr 2018 - May 2018 · 2 mos

    Inspección periódica de procesos y supervisión del personal. Muestreo y evaluación de trabajos ejecutados. Realización de pruebas funcionales y sensoriales para garantizar la calidad del producto. Elaboración de certificados de calidad conforme a los estándares establecidos.