Breitenworbis, Thuringia, Germany
12/2020 – 05/2024 - Senior Site Manager – Deep Tunnel Sewer System project 2 contracts T 07 Employer Ed. Züblin AG, Singapore Branch Project 12 km wastewater tunnel as bored segment tunnel with secondary lining out of microbiologically induced corrosion-resistant steel fiber concrete and HDPE liner Responsibility management of related secondary lining works, in charge of the microbiologically induced corrosion-resistant steel fiber concrete, HR management, budget monitoring, H-S-E, organisation of the subcontractors, leading four civil engineers 05/2020 – 11/2020 Senior Site Manager – Flughafentunnel Stuttgart Employer Ed. Züblin AG, Stuttgart Project Two 2.2 km single track railway tunnel in drill and blast method, Responsibility management of drill and blast works, H-S-E, organization of the subcontractors, leading two civil engineers 01/2018 – 04/2020 Project Manager - ÖBB Koralmbahn Baulos 60.3 St. Kanzian and Baulos 60.5 Stein Employer Baresel Tunnelbau GmbH, Deutschland Project BL 60.5 - Tunnel Stein / Tunnel Lind, twin track railway tunnel, 2,500 Meters of inner lining as water-impermeable concrete construction, Responsibility for HR management, budget monitoring, Claim management, HSE, organization of the subcontractors, leading three civil engineers 08/2015 - 12/2017 Sr. Civil Engineer Tunnel - ÖBB Koralmbahn BL 60.3 St. Kanzian Employer Baresel GmbH, Deutschland Project BL60.3 - Tunnel Untersammelsdorf, twin track railway tunnel, 617 Meter tunneling in lacustrine clay, 50 m top-down section, 617 Meter inner lining as water-impermeable concrete Responsibility for HR management, budget monitoring, claim management, HSE, supervision the groundworks (subcontracted) of bored piles and jet grouting, organization of the subcontractors, leading one civil engineer
Wenn es nichts gibt, das dich glücklich macht – dann bau es dir einfach selbst. Software vom Bauleiter für Bauleiter. Endlich wieder Zeit zum Bauen.
Gründung und Aufbau eines eigenständigen Ingenieurbüros mit Schwerpunkt auf Bauleitung, Bauherrenvertretung, SiGeKo nach RAB 30, sowie technischer Beratung und Projektunterstützung im konstruktiven Ingenieurbau. Leistungen umfassen: • Bauleitung / Projektvertretung • Sicherheits- und Gesundheitsschutzkoordination (SiGeKo) • Baustelleninspektion und Dokumentation • Auswertung technischer Daten & Berichte • Konzepterstellung & technische Sonderlösungen 37339 Breitenworbis
It’s time for the next big thing. Time to define it.
Construction manager for the secondary lining with HDPE liner at the DTSS2 Project T07
Manager for Blast and Drill Flughafentunnel Stuttgart