Greater Syracuse, Italy Area
Midor Refinery expansion project. The Project is including all engineering, procurement, site prefabrication/erection and construction works as well as pre-commissioning, commissioning
EP-300 Steam cracking unit, ethylene & propylene polymer grade production: 190.000 t/yr: Refinery dry gas treatment unit: 166.000 t/yr:
Gas pipeline, overall: 869 km; onshore gas pipeline Greece/Albania - pipe dia: 756 km, 48 in; onshore pipeline Italy - Pipe dia: 8 km, 36 in; sealine - pipe dia: 105 km, 36 in; Compressor station (Greece) CS00 (KIPOI), 3 x: 15 MW; Compressor station (Albania) CS03 (FIER) 3 x: 15 MW; Pipeline Receiving Terminal (TRP) New Metering & piping station CS02 New Scada system and Optical fiber Communication
Upgrading of BAR ESSALAM field: 10 additional Wells to the existing Sabratha Platform 90 Km offshore. The Project is including all engineering, procurement, onshore prefabrication, marine spread, offshore installation and constuction works as well precommissioning, commissioning (including hydrocarbons fill) plus assistance to star-up for the connection of 13 New Wells (about 200 mt water depth).
Position: QC \ Welding Inspector at Oil center Tempa Rossa
Position: QC \ Inspector Location Val D'Agri (Italy)