Alberto Muraro NEBOSH IGC IOSH

CSR CVR OCR - Offshore Client Vessel Representative presso OMV Petrom

Italy

About

βš“πŸš’ Offshore Life! πŸŒŠπŸ› οΈ CVR | CSR | OCR | Safety Leader β›‘ NEBOSH International General Certificate in Occupational Health & Safety πŸ›‘οΈ Passionate HSE professional with solid experience in Subsea Installation πŸŒŠπŸ› οΈ, Pipelay Vessel πŸš’πŸ—οΈ and Heavy Lifting β›“ I believe that safety is not just a priority β€” it’s a value that must guide every decision offshore. My goal is to build and spread a strong safety culture on board, leading by example every single day. Always ready to support the crew, lead safety meetings, and stop the job when necessary. Because nothing is more important than bringing everyone home safe. πŸŒ…βœ… DO IT SAFE | Safety First, Every Time πŸ”₯πŸ’ͺ

Experience

  • OCR CVR CSR Offshore Client Vessel Representative at OMV Petrom
    Mar 2026 - Present Β· 4 mos

    Neptun Deep is an offshore gas field development located in the Romanian sector of the Black Sea. The project combines a deepwater natural gas reservoir in the Domino field with a shallow water natural gas reservoir in the Pelican South field. The development plan for the project is based on 3 subsea drill centres; two located in ~1,000m water depth in the Domino field and one located in ~125m water depth in the Pelican South field. Each drill centre will include a four-well production manifold tied back to the normally unstaffed Shallow Water Platform (SWP) on the shelf. Production from the wells will be separated, and the natural gas will be dehydrated on the SWP to achieve sales quality specification. Production will be transmitted through a ~160 km 30-inch gas production pipeline (GPP) to the Romanian coast where it will transfer to the Transgaz National Transportation System (NTS) at an onshore natural gas metering station (NGMS).

  • North Oil Company Qatar (Hybrid)
    • CSR Offshore Client Site Representative
      May 2025 - Mar 2026 Β· 11 mos

      The field has been developed through several phases and further development phases are envisaged by North Oil Company (NOC), the operator of Al-Shaheen concession. NOC, in an effort to improve the field production capacity, has initiated a field development planned for Al Shaheen known as the RUYA project. The principal objective of the Al Shaheen RUYA field development is: β€’Increase production to 300 kbopd or above and sustain it for more than 5 years. The CSR, Client Site Representative, leading the North Oil Company team onboard the vessel, verifies the Contractor performs the work in line with North oil Company expectations and to the agreed procedures, schedules and standards.

    • Offshore Client Site Representative
      May 2025 - Sep 2025 Β· 5 mos

  • bp (3 yrs 4 mos)
    • CVR - Offshore Client Vessel Representative
      May 2024 - Jun 2025 Β· 1 yr 2 mos

      On board of Normand Sentinel. GTA Tortue Project Commissioning, De-watering, Survey. Production Pipeline dewatering, PLRs installation and inspection, Leak testing, Drying, Production Flowlines MEG filling, Riser Leak testing, MEG displacement of Spool and STFL's

    • CVR - Offshore Client Vessel Representative
      Sep 2023 - May 2024 Β· 9 mos

      Pioneering Spirit is the largest, most versatile offshore construction vessel in the world. Designed completely in-house, the vessel is designed for the single-lift installation and removal of offshore platforms and the installation of record-weight pipelines. The emergence of Pioneering Spirit signifies a step-change in offshore installation and decommissioning. Capable of lifting entire platform topsides of up to 48,000 t and jackets up to 20,000 t in a single piece, she significantly reduces the amount of offshore work associated with installation and decommissioning, moving the work onshore where it is safer and more cost effective.

    • CVR - Offshore Client Vessel Representative
      Dec 2022 - Aug 2023 Β· 9 mos

      on board of Amazon - McDermott ultra deep water J-lay vessel

  • Eni (11 mos)
    • Offshore Installation Manager
      Aug 2021 - Mar 2022 Β· 8 mos

      Revamping of water treatment units, de-gaser and installation new PLC control unit. CERVIA-C Platform

    • Offshore Installation Manager
      May 2021 - Mar 2022 Β· 11 mos

  • Saipem (11 yrs 4 mos)
    • Construction Offshore Superintendent
      May 2015 - Mar 2021 Β· 5 yrs 11 mos

      From January 2019 to December 2020 Barzan Project, Qatar gas, on board DeHe PLV, 32" and 24" pipes clad plus 4,5" and 3,5"piggy back. Anchors and DP positioning system. pipelay under contruction From September 2017 to January 2019: DeHe, Heavy lifting barge and pipelay vessel. Under commissioning, Yantai sevage, Shanghai, China. 5000Ton main crane, ultra deep water installation, S-lay, ROVs. July 2017 to September 2017: Toisa Pegasus, OIS carrier project, developing and wet test of new equipment, Croatia field, simulating worst case scenario, oil&gas eruction spool using a Sonsub prototype to close though a dummy caping stack over a dummy wellhead. From June 2017 to July 2017: Deep Cygnus DP vessel, Hellix Canyon company, Trenching and Rov ops. end of MOB phase, installation of all the trenching equipment. From May 2017 to June 2017: Demob phase CastoroSei in Perama port Greece, maintenance after project, lifting thrusters on deck, heavy and complex lifting. From March 2017 to May 2017: CastoroSei, pipelay vessel. from 90 mt deep water to 13mt water deep, recovery, lay and abandon line 26", 14" and 8". From July 2016 to March 2017: CastoroSei Semi-sub pipeline vessel; ZOHR project, Limassol Cyprus , training welder and preparations of the compain. From April 2016 July 2016 : Headquarter Saipem SA Paris France, preparation of Zohr project compain 2016/2017. From September 2015 to April 2016: Castoro 10, Lakash Project, Pemex, Veracruz Gulf of Mexico, twin pipeline shallow water up to 140 mt WD. 18 ", 28 mm thickness, aprox 60 kilometers. gas pipeline. From May 2015 to September 2015: Castoro 10, Mafumeira project 16"​, offshore pipeline installation, Chevron, Angola, Africa. Castoro 10, Lakash project 18"​& 10", Mexico

    • Welding Technology Engineer
      Dec 2009 - Apr 2015 Β· 5 yrs 5 mos

      Oil and Gas: Welding Technology Engineer Off-shore. CastorOne, Castoro 6, Castoro10, Semac1. Eni-Saipem. From March 2014 to present: Cortemaggiore, Piacenza, Italy. Welding, NDT and Coating laboratory. R&D center. From January 2014 to March 2014: CastrorOne, Enbridge, Walker Ridge project, gulf of mexico, ultra deep water installation, riser and pipeline, 20". April 2013 to December 2013: CastorOne, Jack St. Malo (U.S.A., Texas, Chevron) deep water pipeline under constrution. Riser 20" SCR completed, 24" in progress. January 2013 to April 2013: CastorOne, Sailing from Singapur to Texas for the preparation of the construction activity. Jack S.Malo project (Chevron) deep water pipeline on Gulf of Mexico (-2200 mt), S-Lay mode, riser construction and platform link pipeline, 20" SCR and 24". October 2012 to December 2012: CastorOne, Keppel Benoi Shipyard, Singapore, Pipeline vessel under commissioning, preparation for shallow water sea trials on November. Next project Gulf of Mexico Jan,2013. July 2012 to September 2012: Semac1, HSTD Project, PTSC PetroVietnam, Vung Tau, Vietnam. 6",8",10" and 16". Gas lift pipeline, production pipeline and water injection. September 2010- April 2012 CastoroSei, NORD STREAM PROJECT, 2 pipeline, Carbon steel 48", 26,8 to 41 mm thickness. From Lubmin (Germany) to Viborg (Russian). SAW, SMAW and MIG/MAG. SWSe.100000 joints welded. February 2010 - September 2010 Castoro10, Nord Stream Project, 2 shore-pull, 48", 60 km.