Akeem Dada, PMP®

Project | Subsea Installation | Operations - Engineer

United Kingdom

About

Experienced Project Engineer, with impressive track record on safety practices, solid hands-on technical expertise in subsea installation and pre-commissioning activities of flowlines (rigid & flexible), umbilicals, risers and subsea structures. Adept with offshore operations such as FPSO and SPM mooring lines pre-installation and hook-up, FPSO topsides modification, anchor handling and pipelines Above Water Tie-in (AWTI) operations. PMP certified with a reputation for delivering technically sound and commercially successful projects in challenging environments.

Experience

  • Saipem (Full-time · 4 yrs 1 mo)
    • Lead Project Engineer - Nearshore Pipelay
      Jan 2025 - Present · 1 yr 6 mos

      Northern Endurance Partnership (NEP) Carbon Capture Storage (CCS) Project - British Petroleum Teesside, Northeast England

    • Senior Project Engineer
      Jun 2024 - Dec 2024 · 7 mos

      CO2 Highway Europe (CO2HE) Pre-FEED Study

    • Project Operations Engineer
      May 2023 - Jul 2024 · 1 yr 3 mos

      OSTSEE LNG Pipeline Project (with Pipeline Above Water Tie-in, AWTI Operations) GERMANY

  • Project Engineer at Total
    Jan 2020 - Apr 2022 · 2 yrs 4 mos

    Deep-Water Engineering, Construction & Projects (DW-ECP) Managed Modification Projects on EGINA and AKPO FPSOs

  • Project Engineer at ExxonMobil
    Aug 2018 - Jan 2020 · 1 yr 6 mos

    Upstream Nigeria Digital Strategy (UNDS) Projects. Implemented Wireless Connectivity on Onshore & Offshore (shallow & deepwater) Industrial Assets.

  • Subsea Installation/Operations Engineer at TechnipFMC
    Jun 2016 - May 2018 · 2 yrs

    Projects: KAOMBO SURF & GIRRI Long EFLs Installation

  • Technip (Luanda, Angola)
    • Senior Subsea Installation Engineer
      Jul 2014 - Jun 2016 · 2 yrs

      Project: GIRRI SURF 2 Deep Water Project – TOTAL E&P, Angola • Developed and reviewed Installation Procedures for subsea structures (Gravity Base & Turning Point Systems) • Ensured the delivery of quality engineering documents and procured materials to meet the construction schedule • Specified rigging and prepared installation materials request list – ensuring adequate back-up for materials with minimal wastage • Supervised Installation campaign preparation and planning • Onshore/Offshore Mobilization and Demobilization operations • Implemented HSE management plan in line with CPY & CTR specifications on both the procedures and during onshore/offshore operations • Participated in HAZID/HIRA meetings of Installation of subsea structures • Participated in offshore installation campaigns on board Technip Deep Pioneer Vessel • Organized missions to construction sites (onshore and offshore) for team members and sub-contrators • Project Engineer on Project Support Vessel (PSV) • Coordinated rigging equipment and onshore operational base inventory of materials

    • Lead Installation Engineer
      Aug 2013 - Jul 2014 · 1 yr

      Project: PAZFLOR Water Injection Jumpers Project – TOTAL E&P, Angola • Developed and prepared Water Injection Flexible Jumpers Method Statement & Installation procedure • Prepared Mobilization plans • Specified rigging and other installation aids • Prepared and integrated Inspection & Test Plans (ITP) on installation and mobilization procedures. • Supervised installation campaigns preparation and planning • Implemented HSE management plan on installation and mobilization procedures • Managed a team of installation engineers on the project • Participated in onshore mobilization and offshore installation campaigns • Managed related work scopes including the management of contractors/suppliers • Participated in weekly review meetings and final documentation of lessons learnt • Assisted Subsea Engineering Manager to ensure effective project closeout including documentation at end of each phase