Ajeet Yadav

linkdin Ajeet Yadav

Kanpur Nagar, Uttar Pradesh, India

About

Experience

  • Technical Supervisor at L.N Malviya Infra project pvt ltd.

    Independent Engineer Services during Operation & Maintenance Stage of (1) Six Laning of Kishangarh-Gulabpura Section of New NH-48 (Old NH-79A and NH-79) from Km. 0+000 to Km. 90+000 (New 257+200 to 347+200) (Length 90.000) in the State of Rajasthan on DBFOT (Toll) under NHDP Phase-V (Package-1) (2) Six Laning of Kishangarh-Udaipur-Ahmedabad Section from Km. 90+000 (New 347+200) (Near Gulab Pura) to Km. 214+870 (New 472+070) (End of Chittorgarh Bypass) of New NH-48 (Old NH-79) in the State of Rajasthan under NHDP Phase-V on BOT (Toll) mode (Package-II) (Total Length: 214.87) Supervision consultant under operation & maintenance phase of six Lane of km 192km to 198 km Vadodara _ Surat section of NH -48 (Old NH-8) including four lane extra dose bridge across river Narmada (Total length 6.745km) and old Narmada bridge construction in the year 1977 and in the year 2000 on the river Narmada in state of Gujrat. To prepare geotechnical, geological and borehole profiles with longitudinal sections of alignment. To prepare drawings for construction methodology with alternative methods according to different site conditions and construction sequences for precast and cast-in-situ super structure.

  • Highway Engineer at SA Infrastructure Consultant Pvt. Ltd.

    Independent Engineer services for (i) 4-laning of Aligarh-Kanpur section from Km. 289.000 (Design Ch.302.108) to Km. 356.000 (Design Ch.373.085) (Package-IV from Naviganj -Mitrasen) and (ii) 4-laning of Aligarh-Kanpur section from Km. 356.000 (Design Ch.373.085) to Km. 414.000 (DesignCh.433.728 (Package-V from Mitrasen-Kanpur) of NH-91 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana.