Türkiye
Brief Summary: I have experience in all stages of the electromechanical systems listed below from the feasibility stage to the end of one-year operation and maintenance including project management and control, preparing feasibility report, preparation of tender documents, design coordination of the SD/DD/CD phases of the projects, control of field and supervision, commissioning using all necessary test equipment, handover to the client, operation and maintenance.(Except the maintenance of 500/380/330/220/154/132/66kV systems.) 500/380/330/220/154/132/66/35/10/6.3/1/0/4/0.277kV System energy transmission lines, transformer centres and distribution systems, power plants. 12/24/110 V DC systems. Synchronization generator systems , cable tray systems , MCC panels , high voltage switchgears , UPS, compensation, lighting systems , grounding network , lightning systems , CCTV systems ,TV systems , public announcement system, telephone systems , fire alarm systems , emergency lighting , announcement system , IT system, building management systems , heating,&ventilation& Air-conditioning&HVAC systems, fire protection and hydrant systems, drainage systems , irrigation systems , water softening systems, plumbing&sewage systems etc, and all the electromechanical equipment of these systems.(Excluding project design of all mechanical systems.) Also experienced preparing document, calculation and other office works of above systems. Such as BOQ’s , shop drawings , as-build drawings , panel schedule, lighting calculations, short-circuit calculations, lightning risk analysis, voltage drop calculations , the all calculations of overhead energy lines, preparing material submittals and method statements , superimposing and coordination of other disciplines, control & monitoring , variations & claims & value engineering , organization , motivation, presentation , decision , man hour calculation, productivity, quality control , budgeting ,cost analysis and control, risk management, safety plans, work schedule, security management, preparing checklists, resource management etc. And also i have very professional computer knowledge and programming skills
I am making Consultany about solar system , overhead lines, 36 kV and 154 kV substation feasibility stage to the end of one-year operation and maintenance preparing feasibility report, preparation of tender documents, design coordination of the projects, control of field and supervision, commissioning using all necessary test equipment, handover to the client, operation and maintenance
Control of some constructions at the Rocketsan factory in Lalahan and Elmadağ. Medium voltage, low voltage distribution systems. Fire Alarm, CCTV, Public Announcement, Wi-Fi, Data, Telephone, SMATV systems.
Full management of 13 substations, 330/132/33 kV system. Design coordination, local adaptation coordination, ordering and following of material , preparation of material lists, coordination of drawings, following and organization of subcontractors, field application and coordination, budget, man hour schedule, method statements, check list, QA / QC, ITP list, commissioning procedure, HSE plan, Progress Report, Construction Schedule , preparing of all required technical and management documents , and all required report. All specifications, projects and documents are in English
Building of 500 kV 2 nos and 220 kV 2 nos transformer centres to connect to the international energy grid. Design coordination, local adaptation coordination, ordering and following of material, field application and coordination, budget, method statements, Progress Report, Construction Schedule etc documents. All specifications, projects and documents are in Russian and English
Full management of 380/154/33 kV system, design coordination, ordering and following of material, preparation of material lists, following and organization of subcontractors, field application and coordination, budget, man hour schedule, HSE plan, Progress Report, Construction Schedule, preparing of all required technical and management documents, and all required report