Adrian Zerpa

Project Management | Engineering Manager | Offshore Operations

Doha, Qatar

About

With a robust background in offshore engineering and project management, my journey has led to the role of Offshore Execution Lead at bp. Steering complex projects from concept to completion, proficiency in project planning and execution has been the cornerstone of our team's success. At Eni, he solidified our reputation for excellence as the Offshore Installation Manager, delivering quality results in a demanding offshore environment. The mastery of technical and strategic aspects of offshore operations is reflected in our successful deployment of innovative installation methods and comprehensive interface management. Collaborating closely with multidisciplinary teams, he’s efficiently managed SURF installations, ensuring seamless transitions to operational phases. My commitment hinges on achieving operational excellence and advancing the frontiers of offshore engineering.

Experience

  • Senior Project Lead at TotalEnergies
    Oct 2024 - Present · 1 yr 9 mos

    • Accountable for the timely and safe delivery of the 20” ALK-HAL export pipeline (Block 6) partial replacement. • Lead detailed design and installation engineering for 20” CRA pipeline ensuring compliance with safety and TotalEnergies general specifications. • Collaborated with cross-functional teams to streamline project execution and enhance operational efficiency.

  • Offshore Execution Lead - GTA Ph1 at bp
    Dec 2023 - Sep 2024 · 10 mos

    Responsable for DSV and Construction vessel operational readiness as per bp standard, and ensure safe installation of subsea rigid spools (diving and diverless connection) as part of the ultra deep water bp GTA development.

  • Eni (12 yrs 7 mos)
    • Offshore Installation Manager
      Jun 2022 - Dec 2023 · 1 yr 7 mos

    • Riser and Flowline Lead Installation Engineer
      Aug 2019 - Jun 2022 · 2 yrs 11 mos

      Coral South is a LNG development offshore Mozambique . Responsible for review of the SURF installation methods and plans, SIT follow-up, interface management (technical support).

    • Offshore Company Representative
      Jul 2017 - Aug 2019 · 2 yrs 2 mos

      Company Representative during the Fast Track development project Zohr offshore Egypt. Attended S-Lay and J-Lay pipelaying, pre-commissioning, rigid spools and flying leads installation, umbilical trans-pooling, pre-commissioning and commissioning. Interface with Zohr platform during commissioning operations. Liaison with Zohr PMT and daily reporting

  • Project Engineer at Subsea 7
    Sep 2006 - Jun 2011 · 4 yrs 10 mos