Doha, Qatar
With a robust background in offshore engineering and project management, my journey has led to the role of Offshore Execution Lead at bp. Steering complex projects from concept to completion, proficiency in project planning and execution has been the cornerstone of our team's success. At Eni, he solidified our reputation for excellence as the Offshore Installation Manager, delivering quality results in a demanding offshore environment. The mastery of technical and strategic aspects of offshore operations is reflected in our successful deployment of innovative installation methods and comprehensive interface management. Collaborating closely with multidisciplinary teams, he’s efficiently managed SURF installations, ensuring seamless transitions to operational phases. My commitment hinges on achieving operational excellence and advancing the frontiers of offshore engineering.
• Accountable for the timely and safe delivery of the 20” ALK-HAL export pipeline (Block 6) partial replacement. • Lead detailed design and installation engineering for 20” CRA pipeline ensuring compliance with safety and TotalEnergies general specifications. • Collaborated with cross-functional teams to streamline project execution and enhance operational efficiency.
Responsable for DSV and Construction vessel operational readiness as per bp standard, and ensure safe installation of subsea rigid spools (diving and diverless connection) as part of the ultra deep water bp GTA development.
Coral South is a LNG development offshore Mozambique . Responsible for review of the SURF installation methods and plans, SIT follow-up, interface management (technical support).
Company Representative during the Fast Track development project Zohr offshore Egypt. Attended S-Lay and J-Lay pipelaying, pre-commissioning, rigid spools and flying leads installation, umbilical trans-pooling, pre-commissioning and commissioning. Interface with Zohr platform during commissioning operations. Liaison with Zohr PMT and daily reporting