Abdullah BAYSAL

870 MW CCPP SHIFT CHARGE LEADER

Ordu, Türkiye

About

Experience

  • 870 MW CCPP SHIFT CHARGE LEADER at OMV
    Dec 2012 - Present · 13 yrs 8 mos

    2*435 MWH SİNGLE SHAFT POWER PLANT 520 MVA 450H GENERATOR H2 / CO2 H2 COOLER 275 MW GE FRAME MS9001 FB Gas Turbine Generator 165 MW GE A16 Steam Turbine Generator DOOSSAN HRSG 160 barg / 565 C 25 barg / 514 C 5 barg / 310 C STANDARD FASEL LENTJES B.V AUX.BOİLER 10 barg / 180 C 48 t/h İntegral Deaerator. Desalınatıon operatıons. Water treatment operatıons.

  • ENERJİSA (3 yrs 2 mos)
    • Mechanical Technician
      Apr 2012 - Oct 2012 · 7 mos

      2/42 MWh GE FRAME 6B GAS TURBİNE AND 1*21 MWh SIEMENS STEAM TURBİNE OPERATİONS AND MAİNTANENCE

    • Control Room Operator
      Sep 2009 - Oct 2012 · 3 yrs 2 mos

      42, MW GE FRAME 6B PG 6581 Gas Turbine Generator 22,43 MW SIEMENS T 6259 Steam Turbine Generator STANDARD FASEL LENTJES B.V HRSG 76 barg / 501 C 65 t/h 6 barg / 220 C 10.1 t/h İntegral Deaerator

  • AKSA Energy (7 yrs 11 mos)
    • Mechanical Technician and Control Room Operator
      Dec 2001 - Oct 2009 · 7 yrs 11 mos

      24 MW WARTSİLA 18V32LN DİESEL ENGİNE OPERATİON AND MAİNTANENCE.

    • Mechanical Technician
      May 2005 - Oct 2007 · 2 yrs 6 mos

      15 MWh 4 prc. DEUTZ 640/628 DIESEL ENGİNE MONTAGE-COMMİSSİONİNG - OPERATİONS AND MAİNTANENCE