Toronto, Ontario, Canada
Hello! I am an internationally trained architect with 6 years of local and international experience in all phases of design and a specialization in the Construction Documentation and Construction Administration phases of mid-rise and high-rise residential projects. I pursued sustainability in architecture and attained a post graduate diploma in green architecture to support the growing need for change in the way buildings are designed and built.
Worked on the construction of the Hyatt Centric Hotel located at La Mer, Dubai to perform the following tasks: Evaluation of the design and technical specifications of various architectural and ID products/ materials to check compliance with tender requirements. Reviewing shop drawings and answer technical queries submitted by contractor. Conducting daily site inspections as per contractor's Inspection Request.
Developed conceptual designs ideas for retail, residential, hotel, office, mixed use and masterplanning projects. Produced all required drawings and 3D models of concepts for client approval. Developed models and preparation of drawings and schedules using Revit for client and authority submissions. Produced structural drawings and details for client and authority submissions. Calculation of areas and efficiency of design as per authority regulations. Developed and producing specifications and detail drawings as per client requirements. Coordinated material and joinery specifications with suppliers as per client requirements. Prepared reports for client presentations. Conducted site surveys for a warehouse renovation project.
In charge of the design of Trilegal, a commercial Law firm in India. Designed elements and customised furniture for the project. Coordinated materials, furniture and other design requirements with vendors and contractor. Met with clients to discuss efficient ways of resolving the design as well as vendors to deduce the best quality of products that are cost efficient. Attended site meetings to discuss on going processes and implicate necessary changes. Supervised site work.
Worked under the guidance of the Associate to perform various tasks. Assisted the Junior Architects in redesigning and resolving plan, elevation and sectional drawings. Assigned the task of model making, completed two distinctly detailed models of residential units and gas pipeline layouts respectively.