Findochty, Scotland, United Kingdom
optimistic / peace
> Aker WH Tech from May 2004 mainly with Statoil Kristin HPHT project > Aker TL, XMT Tech., WH Tech. from 2006 with Total Dalia project, Angola on secondment. Part of the team which ran the first Dalia XMT > Aker SV, TL from Nov 2008 with Marathon Oil Norge / Det Norske (now AkerBP), Alvheim project > Aker SV of WH, vertical XMT system c/w EDP / LRP / LLS from Nov 2014 with Total MOHO project, Congo on secondment. Optimised the WH system for the Congo environment. Part of the team which ran the first Aker Solutions vertical XMT system and achieved MOHO first oil target within the required timeframe > Aker SV, Norway from March 2016 assisting with various projects as required > Aker SV, Norway from May 2017 on the AkerBP, Alvheim project as SV > Aker SV, Norway from Dec 2017 seconded to the Total, Kaombo Project in Angola assisting with WH / completion / WO operations as required
Wellhead Field Service Hand running mainly SS-15 equipment and tubulars incl DQ premium connections