Active at Heerema Marine Contractors as Project Engineer. Currently part of the team working on East Brae platform removal. More specific the conductor removal and jacket removal, with our vessels Balder and Sleipnir. Previous assignments: Q1/P1 removal of 5 platforms with bridged arrangements, as specialist engineer on 8 jacket removals which entailed a tripod, 4 legged and 6 legged jackets in different configurations. Onshore engineering and offshore support. Kinsale Head Platform removal, removal of two platforms in front of the Coast of Ireland. Specialist Engineer on Topsides removal with SSCV Thialf. Removal Engineer on EKOFISK project, removal of 4 platforms within the greater EKOFISK complex. Jacket removal EKOA and EKOF with SSCV Sleipnir. Supportive role on EKOA, active role on EKOF. Installation Engineer on the Jacket Foundation Installation Scope for the East Anglia ONE Windfarm Jackets, installation with Heerema's DCV Aegir. Client: ScottishPower/Iberdrola. Site Engineer at Heerema Porto Amboim in Angola on the Total Kaombo Project for over 1,5 year on multiple topics. Scope contained liasing with Yard Construction Team on lifting, seafastening, construction and transport execution/engineering. Provide overal engineering/execution support to yard and inform and involve office project team timely for planning and execution purposes. Other previous assignments: part of the T&I engineering team on multiple lifts of the Johan Sverdrup Drilling Platform, one of which is a 11200mT lift. All lifts shall be done with HMC's SSCV Thialf. http://www.statoil.com/en/Johan-Sverdrup/Pages/Johan-Sverdrup-Field.aspx http://hmc.heerema.com/content/fleet/thialf/ 2 years on the INPEX Ichthys LNG project, involved in - Mobilization of the Aegir - Mooring Pile Transportation and Installation - Flowline installation, J-Lay and R-Lay installation All these scopes are executed by the DCV Aegir, owned and operated by HMC.
Contributing to the removal of a large North Sea Platforms with Heerema vessels. Hydraulic, mechanic, structural and marine topics coming all together. In doing so planning and preparation wise, working together to enable our vessels to remove these platforms from our North Sea. With great colleagues doing great things, team work makes the dream work - cheesy but true.
Specialist Engineer in the Engineering & Preparation phase of offshore Installation and Removal projects with the worlds biggest crane vessels. Take ownership on project scopes in engineering, set-up offshore manuals and support procurement and fabrication processes. Ensure all is prepared for offshore execution. Cherry on the pie is to provide offshore support to HMC’s world class vessel crew on executing these mega lifts and transports. On the links below: Q1/P9 Removal, project lead for the removal of the Jackets. Kinsale Alpha & Bravo platforms, project lead for the removal of the Topsides. Offshore SPOC for conductor removal. Both great & fun projects to have worked on with valuable colleagues.
Shape removal procedures as part of the engineering team to remove out-of-service oil and gas platforms with HMCs SSCV Thialf and SSCV Sleipnir and their crew. This specific project was Ekofisk Alpha (EKOA) and FTP (EKOF). Learn and grow on EKOA and actively take scope lead on EKOF with a team of different skilled engineers, purchasers and fabricators, under the wings of well experienced project leads and project managers. Cherry on the pie were the great offshore executions, supporting the offshore crew in their daily activities to get the job done. Proud to have had this chance, experience and work with all these well skilled persons onshore and offshore. https://www.offshore-energy.biz/conocophillips-gets-nod-to-dispose-of-four-ekofisk-platforms/ EKOA: https://www.offshore-energy.biz/gallery-giant-sleipnir-vessel-wraps-up-decommissioning-campaign-for-conocophillips/ https://www.heavyliftnews.com/sleipnir-completes-first-decomm/
Corporate language: Model to assess an organisation's in place procedures or efforts to be sustainable, based on the ISO 26000 Corporate Social Responsibility guideline. Model was tested within a multidisciplinair international organisation operating in the offshore construction business. Academical language: The development of a CSR capability maturity model to assess an organization's CSR performance, based on the actions and expectations that are given by the ISO26000 guideline. Maturity model verified within a multidisciplinair international organisation.
In the Management of Technology programme I learned to explore and understand technology as a corporate resource - a resource that allows a firm to keep many different balls in the air. It shows how firms can use technology to design and develop products and services that maximise customer satisfaction on the one hand, while maximizing corporate productivity, profitability and competitiveness on the other. - Qualitative and quantitative research - Technological Innovations and their characteristics - Economics - Corporate Finance - Project and Risk Management
Performed calculations and designs on steel structures and objects.
For my Graduation Internship I did a research and design study for a Deepwater Lowering System for onboard the HLV Oleg Strashnov. The project consisted out of several steps: Dimensioning the total weight with factoring, set up a overview of possible system configurations, selecting configuration for further calculations based on demands and dimensions, engineering configuration, final selection and final engineering of the system. The study and engineering resulted in a solution for a Deepwater Lowering System and can be integrated inside the Oleg Strashnov. Furthermore I got more and more interested in the Offshore Business and especially Deepwater Installations which I find now very challenging. With an eight as grade for this traineeship I got my Mechanical Engineering Bachelor diploma .
Performed a recalculation of an offer for a slurry pump drivetrain installation by Siemens Industry department Flender. During the mechanical calculations I discovered some commercial and moral benefits on holding on to conservative calculation methods. This opened my eyes as an engineer that not always hard calculations are basis for decisions, but that they can be multi-dimensional, even in engineering.
Assignment performed: Design a half-angle cut-off for a jacket installation, done on the CAD- department. With help of my mentor I calculated and designed a half-angle cut-off on the pillars of a jacket. I really enjoyed this assigment considering the responsibility and help I experienced at SHL.